Residential MEP Works

Cluster 44 Villa, Jumeirah Islands

Residential MEP Works MEP works

The brief

Full MEP works to a villa in Cluster 44, Jumeirah Islands: power distribution and final circuits throughout, water supply, hot water and drainage, and air conditioning across the house.

What we did

  • Power distribution and final circuits throughout
  • Water supply, hot water and drainage
  • Air conditioning installation and balancing
  • Testing, commissioning and handover records

On site

The property was occupied for part of the programme, so work was staged room by room and water and power interruptions were kept to agreed slots. Finishes were already in place in some areas, which set how services could be routed.

Outcome

Systems were tested, balanced and handed over, with the option of planned maintenance afterwards.

41On site

Photographs from the job.

Tell us your requirements.

Our team will review them and provide a practical, tailored solution within your required timeline.

Site survey

Tell us about the space.

An engineer visits, checks what the unit can carry, and you get a practical proposal. No drawings needed to start.

Prefer the full form? Open the survey page · or call +971 50 905 2061