Activate MCC

Mirdif City Centre

Activate MCC MEP works

The brief

An activity venue at Mirdif City Centre, where the MEP had to suit a space used heavily by the public rather than a standard retail layout — higher occupancy, more equipment, and ventilation sized for people rather than stock.

What we did

  • Lighting and small power to the shopfit layout
  • Air conditioning and ducting to the sales floor
  • Water supply and drainage where required
  • Testing, commissioning and handover records

On site

The venue sits inside a working mall, so installation ran around trading hours and the centre’s permit system. Equipment positions moved during the fit-out, and circuits and ductwork were re-coordinated on site to follow them.

Outcome

Systems were tested, balanced and handed over with the records the centre requires before a tenant can open.

09On site

Photographs from the job.

Tell us your requirements.

Our team will review them and provide a practical, tailored solution within your required timeline.

Site survey

Tell us about the space.

An engineer visits, checks what the unit can carry, and you get a practical proposal. No drawings needed to start.

Prefer the full form? Open the survey page · or call +971 50 905 2061