Trident Bayside

Dubai Marina

Trident Bayside MEP works

The brief

MEP works at Trident Bayside in Dubai Marina, carried out in a residential tower where other apartments stayed occupied throughout. Scope covered power distribution, water supply and drainage, and air conditioning.

What we did

  • Power distribution and final circuits throughout
  • Water supply, hot water and drainage
  • Air conditioning installation and balancing
  • Testing, commissioning and handover records

On site

Working in an occupied tower sets the rules: service lift bookings, agreed working hours, protected routes through common areas, and water and power interruptions scheduled with building management rather than announced on the day.

Outcome

Systems were tested and commissioned, and the building’s management received the records for their own files.

16On site

Photographs from the job.

Tell us your requirements.

Our team will review them and provide a practical, tailored solution within your required timeline.

Site survey

Tell us about the space.

An engineer visits, checks what the unit can carry, and you get a practical proposal. No drawings needed to start.

Prefer the full form? Open the survey page · or call +971 50 905 2061