Go Dental Clinic

BurJuman

Go Dental Clinic MEP works

The brief

A dental clinic at BurJuman. Each surgery needed power for the chair and its equipment, water and suction drainage at the right positions, and air conditioning that keeps a treatment room comfortable without blowing across the patient.

What we did

  • Electrical distribution board and final circuits for treatment equipment
  • Water supply and drainage to each treatment room
  • Air conditioning and fresh air to the treated areas
  • Testing, commissioning and handover records

On site

The clinic sits inside a working mall, so first fix and anything noisy ran outside trading hours. Services were set out from the equipment drawings rather than the architectural layout, because in a surgery the equipment position decides everything.

Outcome

Commissioned and handed over with test records, ready for the clinic’s equipment installation and licensing inspection.

14On site

Photographs from the job.

Tell us your requirements.

Our team will review them and provide a practical, tailored solution within your required timeline.

Site survey

Tell us about the space.

An engineer visits, checks what the unit can carry, and you get a practical proposal. No drawings needed to start.

Prefer the full form? Open the survey page · or call +971 50 905 2061