HVAC Contracting Company in Dubai Trusted by Industry Leaders

Kitchen extract, fresh air and make-up air systems, with supply and extract ductwork fabricated by our own team.

Insulated pipework running alongside ductwork

HVAC & air conditioning

In food processing and food production facilities, HVAC is operational equipment. It shapes indoor air quality, thermal comfort, safety, hygiene and how productive a team can be.

We take full responsibility for understanding each client’s requirements. We identify operational challenges early and give practical, technically sound guidance throughout the project.

We put particular emphasis on commercial kitchen extract, fresh air and make-up air systems, and we fabricate the supply, fresh-air and extract ductwork ourselves.

Typical scope

  • Commercial kitchen extract systems
  • Fresh air & make-up air systems
  • Duct fabrication: supply, fresh air, extract
  • Ducting installation
  • Chilled water systems
  • AHU, FCU, VAV & VRF systems
  • Central plant & ventilation
  • AC installation & maintenance
  • Testing & commissioning
  • AMC for restaurants & units
Insulated ductwork installed at ceiling level
Delivered in-house
  • Design
  • Duct fabrication (units up to 1,000 sqm)
  • Installation
  • Testing & commissioning
  • Maintenance (AMC)

Relevant experience

Food production · Al QuozCommercial kitchens
Food production · DIPCommercial kitchens
Food & beverage · DubaiMultiple shopping mall units

Sectors

  • Food production
  • Commercial kitchens
  • Mall units
  • Healthcare

01HVAC installation

HVAC installation in the UAE: building foundations for efficiency.

Cooling and ventilation planned with the building from day one, not added after the ceiling is closed.

1. Precision engineering for large-scale projects

Installing HVAC during construction isn’t just about putting in ducts and units; it’s about integration. Our engineers work with architects and builders from day one to design systems that blend into the structure. For HVAC installation in Dubai, we focus on:

  • Load calculations: exact cooling needs based on building size, orientation and occupancy.
  • Ductwork design: airflow pathways that minimise energy loss.
  • Equipment selection: energy-efficient chillers, AHUs and VRF systems suited to Dubai’s climate.

2. Custom solutions for Dubai’s unique needs

A hotel in JBR faces different challenges from a villa in Emirates Hills. As one of the leading HVAC contracting companies in Dubai, we use:

  • Smart zoning: independent cooling zones that reduce energy waste.
  • Heat recovery systems: reusing waste heat for water heating or other needs.
  • Green technology: solar-powered HVAC options for sustainable projects.

3. Compliance without compromise

Dubai’s regulations leave no room for shortcuts. Our HVAC installation in Dubai follows DEWA, Dubai Municipality and Dubai Green Building standards.

From fire-rated ducts to noise control, we make sure systems are safe, efficient and compliant.

02How the work runs

From first visit to handover.

The same team carries each stage, so nothing is lost between the drawing, the approval and the installation.

01

Survey and load check

We measure the space, count the heat load it actually has to deal with, and check what the landlord’s chilled water or condenser provision allows.

02

Design and coordination

Duct layouts, diffuser positions and extract routes drawn against the ceiling plan, so services and interior design do not fight each other.

03

Duct fabrication

Supply, fresh-air and extract ductwork fabricated in our own workshop, which keeps site time short and changes quick.

04

Installation

Ducting, FCUs, AHUs, VRF and controls installed by our own technicians, with kitchen extract and make-up air treated as one system.

05

Testing, balancing and commissioning

Airflows balanced to the design figures and recorded — the step most often skipped, and the reason spaces run hot or noisy.

06

Maintenance

Planned preventive visits and call-outs under an AMC, scheduled around your trading hours.

Authority approval on HVAC normally sits with your consultant or landlord. Our scope is the design, fabrication, installation and commissioning.

03Why Xylem

Why choose Xylem as your HVAC contractor in Dubai?

The same team designs, fabricates, installs, balances and maintains the system.

01

Ductwork made in-house

Supply, fresh-air and extract ducting fabricated in our own workshop, so changes on site are quick.

02

Kitchen extract done properly

Extract and make-up air designed as one system, so kitchens do not run negative.

03

Balanced and recorded

Airflows balanced to the design figures at commissioning: the step most often skipped.

04

Maintained around your hours

Planned and reactive AMC visits scheduled around trading hours.

What we need from you

  • The reflected ceiling plan and interior layout
  • The kitchen equipment schedule and extract rates
  • The landlord’s chilled water or condenser provision
  • Access, and the hours noisy work is allowed

None of it is essential to start. If you do not have drawings, we measure the space ourselves at the survey.

What you get at handover

  • Balancing figures for each outlet
  • Commissioning records for the equipment installed
  • Drawings updated to match what was installed
  • An AMC quotation if you want us to maintain it

Records are handed over as part of the job, not produced weeks later on request.

04On site

Air conditioning work, photographed on our own jobs.

Ducting and fabrication, FCUs, AHUs and rooftop units — installed, connected and balanced by our own teams.

FAQCommon questions

Questions we are asked before a survey.

Something not covered here? Call +971 50 905 2061 or request a site survey.

Do you fabricate ducting yourselves?

Yes, in our own workshop. Duct fabrication in-house keeps site time short and means changes do not wait on an outside supplier.

Can you design kitchen extract and make-up air?

Yes, and the two have to be designed together. If the extract is not balanced by make-up air the kitchen runs negative, doors pull shut and the extract never clears properly.

Do you install FCU, AHU and VRF systems?

Yes, along with ducting, controls, and testing and balancing at handover.

Do you maintain the system after installation?

Yes, under an annual maintenance contract. The team that maintains the system is normally the team that installed it, so the drawings and commissioning records are already in our hands.

My AC is not cooling properly — what now?

It is usually filters, airflow or refrigerant, and it is worth checking before the summer peak rather than during it. Our guide on preventing summer AC breakdowns covers the practical checks.

Tell us your requirements.

Our team will review them and provide a practical, tailored solution within your required timeline.

Site survey

Tell us about the space.

An engineer visits, checks what the unit can carry, and you get a practical proposal. No drawings needed to start.

Prefer the full form? Open the survey page · or call +971 50 905 2061