Bread Ahead

Mirdif City Centre

Bread Ahead MEP works

The brief

A bakery and café at Mirdif City Centre. Baking equipment is heavy on power and on extract, and the drainage has to cope with a working production area as well as a customer-facing counter.

What we did

  • Power distribution and final connections to kitchen equipment
  • Hot and cold water supply and grease-bearing drainage
  • Kitchen extract, make-up air and air conditioning
  • Testing, commissioning and handover records

On site

The unit was fitted out inside a trading mall. Extract routing was the constraint — the route to the riser dictated the ceiling coordination, and the make-up air had to balance it or the space would have run negative.

Outcome

Handed over commissioned, with extract and make-up air balanced and the records issued to the operator and the centre.

08On site

Photographs from the job.

Tell us your requirements.

Our team will review them and provide a practical, tailored solution within your required timeline.

Site survey

Tell us about the space.

An engineer visits, checks what the unit can carry, and you get a practical proposal. No drawings needed to start.

Prefer the full form? Open the survey page · or call +971 50 905 2061